Trinity Operating Procedures - TOPs

TOPs Overview 

Rev: 4/5/2018

General navigation:

TOPs index (organized by Core Process):

TOP Description

Policy Establishment

POLCY Policy Establishment Process

Resource Management

RMGMT Resource Management Process
Resource Management - Team Management
STAFF Staffing Team Positions
TRAIN Training Program 
Resource Management - Production Equipment Maintenance
BRKDN Breakdown Repair
PREVM Maintenance, Preventive
Resource Management - Die & Tooling Management
DSCON Die Steel Control
DSHOP Die Shop
SECTL Tooling, Secondary, Inspection
TOOLT Tooling, Identification and Storage of
Resource Management - Raw Material Management
CSUPL Materials, Customer-Supplied
CYCLE Cycle Counting
MCRIB Crib, Machine Shop
MNTRM Raw Material, Maintenance of
PURCH Material, Raw, Purchasing
RECOM Material, Receiving "Other" Raw
RECRM Material, Receiving Raw
RMNON Material, Raw, Non-Conformance
Resource Management - Supplier Management
HTTRM Heat Treater Test Result Monitoring
SAPVL Supplier Monitoring and Approval
Resource Management - Measuring Instrument Management
CALIB Calibration Control System
GAGES Gage Control
MSURE Measuring Equipment, Selection & Use of Precision
RECHK Measurements, Rechecking, With Out-Of-Calibration Instruments
STAMP Stamps, Control & Use of
Resource Management - Computerized System Management
SYSTM Computerized Systems
CYBER Cyber-security Incident Response
Resource Management - Administrative Management
DOCUM Document Control and Distribution
FORMS Forms Control
RSRCE Resource Review and Allocation
ACCTG Accounting Activities and Analysis
MEETG Regularly-Scheduled Meetings
SHIFT Communication, Shift
SPECS Reference Specification Library Maintenance
STATS Statistical Techniques
Resource Management - Health, Safety & Environment Management
ACDNT Accident
DRUGS Drug and Alcohol Policy, Trinity Forge
DRUMS Managing Drums
EMERP Emergency Preparedness
ENVIR Environmental System Management
HAZCM Hazardous Material Communication Program
LOKTG Lock-Out/Tag-Out
SCRTY Security Matters
SFTYC Safety Committee
WASTE Waste, Disposing of Hazardous and Non-hazardous
Product Development
PRDEV Product Development Process
Product Development - Quoting
QUOTE Quoting
Product Development - New Product Development
CASTS Casts, Die Impression
DIMKR In-House Die Making Procedure
MPSMM MPS Maintenance and Control
NEWDI Die Orders, New
SOLID Solid Model Creation
QARTI Quality Control Planning and First Article Inspections
PRINT Prints, Engineering
SINKR Die Sinkers, Outside Use of
TPSMM BOM and Router Maintenance and Control
Product Development - Engineering Change Orders
DCORD Die Change Orders
Order Fulfillment
PRODN Order Fulfillment Process
QCTRL Quality Control
FLSPG Flight and Nuclear Safety Program
SCRAP Scrap Control
Order Fulfillment - Contract Review, Scheduling and Confirmation
CHNGE Order Changes, In-Process
ORDER Order Entry and Contract Review
PSCHD Schedule, Production
REQST Information, Customer Requests for
Order Fulfillment - Starting a Production Forging Job
CHEMC Chemical Check Analysis
PREQC Pre-Forge Quality Control
CUTIT Material, Cutting Raw
JSTRT Production Forging Job, Starting a
Order Fulfillment - Producing a Production Forging Job
AFTFG Die Procedures, After Run
CDCHG Changes, Heat Code
FORGE Forging
PROQC Quality Control, In Process
Order Fulfillment - Processing Parts After Forging
BLAST Blasting
FTEMP Forging Temperature, Monitoring and Control of
HARDT Hardness Testing
MFLUX Magnaflux
OTEST Testing, Outside
POSQC Post-Forge Quality Control
POSTP Post-Production (re)work
SUBCO Subcontractors, Control of Parts to
TREAT In House Heat Treatment
Order Fulfillment - Producing a Production Machining Job
MOPPP Machine Shop Operations, Performing
MOPQC Machining Quality Control
MORDR Machine Shop Order, Processing
MWELD Performing Welding Operations
Order Fulfillment - Controlling & Shipping of Finished Product
FINIS Finished Product, Control & Shipment of
NOCON Control of Non-Conforming Product
Order Fulfillment - Invoices and Certificates of Material
AFTSH Invoices and Certifications
Order Fulfillment - Handling Problems after shipment
RCALL Recall of Product
RTRNS Parts Returned by Customer, Control of
Review & Improvement
IMPRV Review and Improvement Process
Review & Improvement - Customer Feedback
CSRVY Customer Surveys
CUSTC Customer Complaints
Review & Improvement - Analysis of Operational Data
JCOST Job Costing
QDATA Data Analysis, Quality
Review & Improvement - Policy Enforcement
ENFRC Top Procedure Enforcement
IAUDT Auditing, Internal Quality
Review & Improvement - Continual Improvement
CARRR Corrective and Project Action
IMPTL Tooling, Improving and Process
RREVU Resink Review
Review & Improvement - Management Review
MREVU Management Review
Human Resources Policies & Procedures*
ABSEN Attendance Policy
APLIC Employment Application Process
BENFT Synopsis of Benefits
FMLAP Family & Medical Leave
EEOAA Equal Employment Policy & Affirmative Action Plan
GUIDE General Guidelines
SXHAR Policy Against Sexual And Other Unlawful Harassment
VHCLE Business Use of Vehicles
*Personnel procedures are beyond the scope of the Quality Management System

Revision history:

Release Date

Description of Change

Owner

Approver

12/06/2017

Initiated by combining previous index.htm and tops.htm as part of TOPs re-format. Modified to reflect new population of TOPs. Champions column deleted since now handled by Internal Audit system.

Tim Ellis

Todd Sheppard

4/5/2018

Added TOP-CYBER.

Tim Ellis   

Todd Sheppard














Documents are controlled only when viewed on-line at trinityforge.com in the original English -- printed copies or translations are not controlled documents.
© Trinity Forge & Machine