Trinity Operating Procedures - TOPs
TOP-POSTP: Post-Production (Re)Work
Rev: 1/15/2021
Scope: This procedure covers post-production work to forgings done internally in the Forging Division: cold coining, restriking, grinding, bending, restamping and painting. It does not cover subcontracted work or cleaning.
Procedure:
STEP | WHO | WHEN | INFO TO USE | WHAT TO DO |
1 | QA Manager, QC Supervisor or Forging Engineer | When setting job up or upon determining a job needs rework | Production Floor Traveler; Blueprint(s); information received from other team members; parts reclassification via e-mail (if any); own observations | If Blueprint(s), Production Floor Traveler indicate that post-production work is required (common for cold coining and bending) or if parts are found to need rework, ensure that the requirements of any parts reclassification is addressed. Forward Production Floor Traveler to Post Forge Supervisor |
2 | Any team member | As inspect parts after forging | Production Floor Traveler; Blueprint(s); own observations | Tag containers with a Red Rework Tag with needed post-production steps and notify QA Manager, Post Forge Supervisor or QC Supervisor. |
3 | QA Manager or QC Supervisor | Upon notification from QC Inspector or any team member | Notification from QC Inspector, own observations, Production Floor Traveler; Blueprint(s), emails, or any team member | Determine if parts need post-production work; if so, attach a Red Rework Tag with rework instructions to all containers of job requiring post-production work explaining what to do and why; add applicable steps to Router in M2M and re-print Production Floor Traveler; if adding a Router step to rework stamping, add an additional step for QC first part verification. |
4 | Post Forge Supervisor | Time to start post production step for parts | Production Floor Traveler; container tags; Blueprints(s), sample parts, verbal instructions, or parts reclassification(s) via e-mail from QC team member | Assign a team member as Post Forge Helper to perform work; ensure that the requirements of any parts reclassification is addressed; ensure worker knows exactly what is required; provide any needed supplies. |
5 | Post Forge Helper* or Shipping Helper | As assigned | Sample and verbal instructions from Post Forge Supervisor; any other info provided by a supervisor | Carefully perform work as instructed; be sure the container you are working from has a QC tag that shows that all previous steps are complete and specifies the step(s) you are performing; be sure there is a container tag on any container you are working into, and write heat code on outside of box (for ready shipment only); if unclear on any point, stop work and get answer from a supervisor, leadman or QC Specialist; as you complete a container, move the QC container tag to the container you have completed and remove container tag (if the containers do not come out even, have QC Inspector create or destroy extra QC tags); stop work at any time if told to do so by a leadman, supervisor, or QC Supervisor. |
6 | Post Forge Supervisor or Leadman | Periodically while work is being performed | Production Floor Traveler; container tags; Blueprint(s); possibly sample parts | Monitor progress of work; spot check quality of work; be sure supplies are available; be sure all containers are properly tagged; have filled containers moved to next area. |
7 | QC Specialist | As directed by Production Floor Traveler Blueprint(s) | Production Floor Traveler; Blueprint(s) | Perform routine inspection of those post-production processes so directed by Production Floor Traveler and Blueprint(s) and all cold-work process. |
8 | Post Forge Supervisor or QC Supervisor or QA Manager or Shipping Supervisor | When work is complete | Production Floor Traveler; Blueprint(s); container tags; parts reclassification via e-mail (if any) | Ensure that all parts have been processed, inspected (or re-inspected), all containers have been properly tagged with Green Tags, and heat code is placed on outside of container (for ready shipment only), all parts moved to next area, inspection or re-inspection noted on Production Floor Traveler marked complete for this step; if there is a parts reclassification via e-mail for this work, return acknowledging e-mail to the initiator of the parts reclassification. |
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
1/15/21 |
Updated to replace green tag with red rework tag on line 2, replace disposition tag with red rework tag line 3. |
Dustin Jump |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|