Trinity Operating Procedures - TOPs

TOP-DSHOP: Die Shop

Rev: 12/06/2017

Scope: This procedure covers in-house die and trimmer make-ready and/or repairs. It is divided into three sections, any of which may pertain to a given situation.

Procedure:

STEP

WHO

WHEN

INFO TO USE

WHAT TO DO

PREPARATION OF NEW DIES
a1 Anyone in Die Shop New die arrives from die sinker Dies, tooling, print, Die Layout Fully inspect die and related tooling, note any deviations on the Die Improvement Slip; send Die Improvement Slip to engineering.
a2 Die Shop Supervisor, Die Shop Leadman, Forging Engineer, Die Man After die received by Die Man Personal observation, approved Forging Print or Die Layout Visually inspect die; mark up areas that need to be modified to match print; (or) verbally give instructions for changes to Die Shop Leadman; Make sure any requested changes are added to Die Improvement Slip
a3 Die Shop Leadman or Die Man Upon instructions from person inspecting die Marked up die; instructions from person inspecting die; possibly marked up part or Die Print Make changes to die as instructed and prepare to add stamping
a4 Die Shop Leadman or Die Man As die is ready for stamping Approved Forging Print Stamp die according to approved Forging Print
a5 Die Shop Leadman, Die Man or QC Inspector After die stamped Approved Forging Print Visually inspect die stamping
a6 Die Shop Supervisor Die is ready for production Visual inspection, Die Man or Die Shop Leadman approval Change Job Order to closed in M2M.

REWORK DIES/TRIM TOOLING (IN DIE SHOP)

b1 Any manager, typically Production Leadman QC Inspector, Hammerman or Die Shop Supervisor, Production Supervisor Upon determining need for forge die/ tooling repair Visual observation, info from Hammerman , Quality Control department, own judgment; Job Order Mark up areas to be modified or repaired (or) verbal instructions to Die Shop Leadman (or) initiate Job Order.
b2 Die Shop Leadman, or Die Man Upon receipt of repair instructions Marked up die/tooling; verbal info; Job Order Make repairs/changes to die/tooling as instructed.
b3 Die Shop Leadman, or Die Man Upon receipt of die/tooling Die Improvement Slip; own judgment If repair affects future die sinks, complete Die Improvement Slip, giving full details of changes made; (see TOP-IMPTL).
b4 Die Shop Leadman, or Die Man Repairs complete Personal observation, notification from Die Shop Leadman Notify Production Leadman or Production Supervisor die/tooling is repaired and ready for use.

REWORK DIES/TRIM TOOLING (IN PRODUCTION AREA)

c1 Die Shop Supervisor or  Die Shop Leadman, QC Inspector, or Hammerman Upon determination of need for die/tooling repair Visual observation, info from Hammerman , Quality Control Dept., own judgment Give verbal instructions to Die Shop Leadman, Die Man or Die Shop Trimmer Man for repair.
c2 Die Man or Die Shop Trimmer Man Upon receipt of repair instructions Verbal information Make repairs/changes to die/tooling as instructed; If this is a change that effects a resink change, make Die Improvement Slip and turn in to Engineering.

Revision history:

Release Date

Description of Change

Owner

Approver

12/06/2017

Updated to comply with revised Quality Manual and new TOPs format.

Tim Ellis

Todd Sheppard


















Documents are controlled only when viewed on-line at trinityforge.com in the original English -- printed copies or translations are not controlled documents.