Scope: This procedure covers in-house die and trimmer make-ready and/or repairs. It is divided into three sections, any of which may pertain to a given situation.
Procedure:
STEP |
WHO |
WHEN |
INFO TO USE |
WHAT TO DO |
PREPARATION OF NEW DIES | ||||
a1 | Anyone in Die Shop | New die arrives from die sinker | Dies, tooling, print, Die Layout | Fully inspect die and related tooling, note any deviations on the Die Improvement Slip; send Die Improvement Slip to engineering. |
a2 | Die Shop Supervisor, Die Shop Leadman, Forging Engineer, Die Man | After die received by Die Man | Personal observation, approved Forging Print or Die Layout | Visually inspect die; mark up areas that need to be modified to match print; (or) verbally give instructions for changes to Die Shop Leadman; Make sure any requested changes are added to Die Improvement Slip |
a3 | Die Shop Leadman or Die Man | Upon instructions from person inspecting die | Marked up die; instructions from person inspecting die; possibly marked up part or Die Print | Make changes to die as instructed and prepare to add stamping |
a4 | Die Shop Leadman or Die Man | As die is ready for stamping | Approved Forging Print | Stamp die according to approved Forging Print |
a5 | Die Shop Leadman, Die Man or QC Inspector | After die stamped | Approved Forging Print | Visually inspect die stamping |
a6 | Die Shop Supervisor | Die is ready for production | Visual inspection, Die Man or Die Shop Leadman approval | Change Job Order to closed in M2M. |
REWORK DIES/TRIM TOOLING (IN DIE SHOP) |
||||
b1 | Any manager, typically Production Leadman , QC Inspector, Hammerman or Die Shop Supervisor, Production Supervisor | Upon determining need for forge die/ tooling repair | Visual observation, info from Hammerman , Quality Control department, own judgment; Job Order | Mark up areas to be modified or repaired (or) verbal instructions to Die Shop Leadman (or) initiate Job Order. |
b2 | Die Shop Leadman, or Die Man | Upon receipt of repair instructions | Marked up die/tooling; verbal info; Job Order | Make repairs/changes to die/tooling as instructed. |
b3 | Die Shop Leadman, or Die Man | Upon receipt of die/tooling | Die Improvement Slip; own judgment | If repair affects future die sinks, complete Die Improvement Slip, giving full details of changes made; (see TOP-IMPTL). |
b4 | Die Shop Leadman, or Die Man | Repairs complete | Personal observation, notification from Die Shop Leadman | Notify Production Leadman or Production Supervisor die/tooling is repaired and ready for use. |
REWORK DIES/TRIM TOOLING (IN PRODUCTION AREA) |
||||
c1 | Die Shop Supervisor or Die Shop Leadman, QC Inspector, or Hammerman | Upon determination of need for die/tooling repair | Visual observation, info from Hammerman , Quality Control Dept., own judgment | Give verbal instructions to Die Shop Leadman, Die Man or Die Shop Trimmer Man for repair. |
c2 | Die Man or Die Shop Trimmer Man | Upon receipt of repair instructions | Verbal information | Make repairs/changes to die/tooling as instructed; If this is a change that effects a resink change, make Die Improvement Slip and turn in to Engineering. |
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|