Trinity Operating Procedures - TOPs
TOP-PREQC: Pre-Forging Quality Control
Rev: 12/06/2017
Scope: This procedure covers Forging Division pre-forge quality preparation and inspection.
Procedure:
(If
corrections are required to the dimensions in the SPC Program go
to Step 4).
STEP
WHO
WHEN
INFO TO USE
WHAT TO DO
1
Any
member
of the QC Team
Upon
receiving new Production
Floor Traveler
Production
Floor
Traveler
and QC Inspection FolderQC
Inspection Folder
with all its contents.
Verify
that the QC Inspection Folder
has
the approved Production
Floor Traveler on front and
all necessary inspection documents inside; verify that the
Production Floor
Traveler is correct; if incorrect, inform responsible
Forging Engineer
to make corrections (IMPORTANT: accuracy of Traveler
is critical).
2
Forging Engineer
Traveler (Router)
information is incorrect
Job Order; Router;
personal knowledge
Make
corrections to Router
and initiate printing of new Production
Floor Traveler for production and QC; return to person who
initiated
correction.
3
QC Leadman or any
supervisor or manager
As
production crew
prepares to begin forging; a Post
Forge Helper begins work; a new
shift begins or the production crew has mid-shift changes
Personal
observation;
discussions with
Production Supervisor
; Production
Floor Traveler, Blueprint(s)
and contents of QC
Inspection Folder;
SPC
Program
Assign
QC Inspector(s)
to job (usually forging, but may be coining or other post-production
task as well); ensure inspector understands the inspection needs as
required by the Production
Floor Traveler and Blueprint(s),
and has
all necessary information, gages, measuring equipment and supplies.
4
Any member
of the QC team
Data
in SPC Program
does not match dimensions on print
QC Print, SPC Program
Notify
QC Supervisor
via e-mail to make corrections in SPC
Program.
5
QC
Supervisor
Receiving
notification dimensions in SPC
Program do not correspond with
QC Print
QC Print, SPC Program
Direct
a QC team member trained to make changes in the SPC Program to
correct
the issue; notify QC team member via e-mail that corrections have
been made.
6
QC,
Die Shop or Die Prep
Team Member
Before
forging: as
requested by QC, Die Prep or Die Shop team member (not the same team
member
as performing this step)
QC Print; Shop Schedule;
Production Floor
Traveler
Check
forge die before
it is put into production to verify that the correct die is being
prepared (this includes verifying the correct die version is being
prepared) and that all lettering to be forged into the part agrees
with QC
Print
(reminder: Do not base your verification on notes on the
Production Floor
Traveler; Die Prep and Die Shop must use a QC Print or an
approved
Forging Print
and the Shop Schedule when performing a stamping
task); if
an error is discovered,
point
it out to Die Prep worker for correction; if there is a disagreement in
the QC and Die Prep documents, report it to the QC Supervisor or
Forging
Production Supervisor
or if needed go to an
Forging Engineer
for
resolution; do not approve a die for production until all problems and
questions have been resolved.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|