Trinity Operating Procedures - TOPs

TOP-SCRAP: Scrap Reporting

Rev: 12/06/2017

Scope: This procedure covers the identification and accurate accounting of scrap produced within the company.

Procedure:

Identification and Approval of Scrap

At any point in the manufacturing process product can be deemed a scrap item. Identification of scrap can be made by anyone, however, approval to scrap will only be done by a supervisory level person. Once supervision agrees that product is scrap then the data must accurately be recorded.

Scrap Recording

Scrap will be recorded at each work center throughout the process as the employee scans off of a specific job. In conjunction with scanning the scrap into M2M the employee must enter the scrap totals and scrap cause on the Scrap Log associated with their area. Steelyard scrap is scanned and the scrap causes are logged on to the Steelyard Scrap Log. Hammer scrap is scanned by the Hammerman only and the scrap causes are entered on the Hammer Scrap Log. Postforge scrap is scanned and the scrap causes are logged onto the Postforge Scrap Log. Machine and weld scrap is logged on Discrepancy Reports.

Entering Scrap Causes

Scrap Logs are gathered and delivered to clerks and entered on a daily basis. If the scrap causes or data is inaccurate the documents will be returned to the appropriate supervisor and fixed within 1 day. Machine and weld scrap is entered by the Machinin QC Supervisor twice weekly; in the Machining QC Supervisor's absence, the QC Leadman enters the machine and weld scrap twice weekly.

Scrap Reporting

Postforge QC Inspectors or Machining QC Inspectors will monitor total scrap %, using JobReport.xls, on each Job Order as the last step prior to releasing the job to Shipping. Report as per instructions below in Review and Approval. It is determined that 1/2% of the total cut quantity2 is an allowable scrap miscount. Any lower threshold may be directed by specific customer requirements as recorded on the Router per TOP-TPSMM. Any more than this and the scrap must be researched and adjusted before the Job Order can be closed.

Scrap: Review and Approval

Scrap: Evaluation

The QA Manager will use the spreadsheet ScrapReporting.xls to evaluate and monitor scrap cause, evaluate accuracy of scrap cause data input, and review cost associated with this scrap. In their respective areas, the Forging Superintendent and Machining Superintendent will conduct a weekly review of the scrap data and verify review of Job Orders that exceed the criteria established above, and present their findings to the VP-Manufacturing.  Any other relevant data discovered during this review will also be presented.

____________________________________________

1 Review refers to a weekly scrap meeting discussing each scrap item in excess of 5%, including those that will become CARs. Meeting consists of Forging or Maching QC Supervisor, QC Inspector, production representative and anyone the QC Supervisor deems necessary.

2 Total cut quantity equals the number of parts a billet can make.

Revision history:

Release Date

Description of Change

Owner

Approver

12/06/2017

Updated to comply with revised Quality Manual and new TOPs format.

Tim Ellis

Todd Sheppard


















Documents are controlled only when viewed on-line at trinityforge.com in the original English -- printed copies or translations are not controlled documents.