Trinity Operating Procedures - TOPs
TOP-MORDR: Processing a Machining Department Order
Rev: 12/06/2017
Scope: This procedure covers the processing of an order through the Machining Department.
Procedure:
1 Upon review of daily
schedule showing newly released Job
Orders Shop Schedule
(Machining) Review Job Order to
be sure all necessary info is present;
add operation's steps to the Router
(may involve research to determine
steps). 2 On receipt of Job Order Machining Job Order;
Machining
Schedule; MPS;
print;
possibly
other documentation Call up and review MPS; determine if any changes are
needed to the MPS's Inspection
Orders per Job
Order
or to prints modified via e-mail, and make any needed MPS changes
(other than "cover sheet" data) per TOP-MPSMM;
update the MPS's "cover sheet" to reflect the specifics of the
current
order; print the whole MPS Job Packet; pull print from Print Viewer; check
for revision level and insert in packet; have the Machining Superintendent,
Machining Department
Programmer or Machining
Department Supervisor review and sign-off on the MPS
cover
sheet when the MPS Job Packet is set up; have Inspection
Order reviewed
and
approved by QC Supervisor;
after securing approval, file the packet in
the Machining Job File. 3 Upon review of Machining Department
Schedule for jobs
scheduled to start within two weeks Pull the folder for
each job being released and make any
changes needed to bring the information up to date; return the cover
sheet to the Machining
Job File;
build an MPS Job
Packet for each
operation
by adding copies of prints,
CNC Program
hard copies, Assembly
Process
Logs
and any
other documents needing to go to the Machine Operator, Welder, QC Inspector, Machining Department Crib Attendant
or Machining Department
Material Handler. 4 Upon receiving copy
of Machining
Department
Schedule MPS print; CNC
Program
(if any) Review documents and
program for revision level; determine
what, if any, changes are needed, and, if so, modify CAM file;
generate NC
Program
and NC code file;
move NC
code file
for the operation in the
"approved-to-run" directory; the NC
Program should contain the
following information: Die#, DSN#, Revision, Machine#, Operation# and
variation code if needed; print the NC
code file out as the "hard copy"
and insert hard copy of the printed program in the operation's MPS Job Packet; update
the MPS if needed to reflect any program changes. 5 Daily Current Machine Job List; Production Floor
Travelers; product
received from Shipping Verify that all
paperwork and tags are complete and appear to
be correct; transfer parts as needed to processing containers (while
parts are being transferred, place container tag on the container you
are transferring into; if container tags do not come out even, make or
destroy extra QC tags); deliver material to the machines per TOP-MOPPP
or to material storage racks if not immediately needed for production. 6 Upon
receiving new MPS
Job Packets Information in MPS Job Packet;
current Machining
Department
Schedule Go through the needs
of each operation and kit the tools and
supplies needed for each operation; notify Tool Maker of any needed
fixtures or other tools; coordinate with QC
Inspector to be sure all
inspection equipment is ready for the job; if resources are not
available or may impact the scheduling of the job, notify the Machining Superintendent
or Machining
Department
Supervisor. 7 Upon notification
that tool or fixture work is needed Verbal
notification; prints; Machining
Superintendent's
instructions Work with Machining Superintendent
and others as
needed to determine what tools and fixture work is needed, and when it
is
needed; acquire the necessary materials and produce the tools and
fixtures; secure Production
Floor Traveler for tooling work from
Machining Superintendent;
mark all pieces with the die
number;
turn the tools over to the Machining
Department Crib Attendant and fixtures to Machining Department Material
Handlers. 8 Machining Department Clerk
or
Machining Department
Supervisor As time is
approaching for an operation to begin (typically
several hours ahead) Personal judgment;
Machining
Schedule; MPS
Job Packets 9 Operator* Upon Machining Superintendent's
notification
that a new operation is to be initiated shortly Machining Superintendent's
verbal
notification; MPS
Job Packet Get operation's MPS Job Packet and kit
from Tool Crib; verify
that the preparations for the job are complete and that the documents
seem to be complete; verify the kit appears to be correct and
complete (green dot
indicates kit is complete); if kit tag has a red dot
(indicating that kit is incomplete); refer to kit tag for
items
that are
short and find items; notify Machining Department Programmer to download program; review
the job
for ideas and questions. 10 Upon receiving
notification to download program Machining Department
Schedule; CNC Program; Machining
Department Supervisor's instructions Prepare CNC
Program for
download; verify file header
information matches information on Machining Schedule;
place CNC Program
in appropriate machine folder. Operator* When time to run a
new job Machining Superintendent's
verbal
notification; Production
Floor Traveler; Inspection
Order and rest of
MPS Job Packet
for machining Take the kit for the
operation to machine; check to be sure
you have everything for the job, including material and CNC
Program (if
any); verify that all documents match the Production Floor Traveler
(this
includes revision level of prints, hard copies and photos);
verify that the work pieces and container tags match the print and
Production Floor
Traveler; resolve any questions or suggestions with
your supervisor; set up and run the job per TOP-MOPPP;
when
complete check MPS
Job Packet with last machined part from QC; return kit
and unused materials back in with Machining
Department Crib Attendant to close out the
operation(s). 13 Upon receiving MPS Job Packet
documents back after operations
complete Inspection Order,and
rest of MPS Job
Packet
from
machining; Production
Floor Traveler; Assembly Process
Logs Verify that
operations have been completed to standards set
out in Standard Router,
review counts are accurate; review materials
issued to job;
consider how the job might be improved next run; consider what steps
can be taken to prevent potential problems in future runs; decide if a
change is indicated for the Standard Router
and, if so, initiate MPS
change per TOP-MPSMM;
forward completed packet to Machining
Department Clerk. 14 Upon receiving MPS Job Packet
documents back after operations
complete Inspection Order, and
rest of MPS Job
Packet
from machining or subcontracted operation; Production Floor Traveler, Assembly
Process
Logs Discard duplicate
print copies; scan all pertinent document
into the shared directory for retention per TOP-DOCUM. 15 As jobs are complete
or at a semi-finished hold If job is to be warehoused,mark
part count on container; ensure that the product is securely packaged,
properly tagged (or marked), and protected from deterioration; if the
parts are to be warehoused for longer than one week ensure that they
are tagged and dated with the date they are warehoused and that there
is an Standard Floor Traveler
addressing their warehousing and
preservation. 16 At least once every 3
months Date on container Check Machining Department
for stored machined parts; if box
date is 3 months old or older, open and check parts for damage and
deterioration; if parts are in good shape, stamp boxes with review
stamp, inspection ID, and date; if damage is found on a machined part,
notify Machining
Superintendent immediately; perform steps
as
instructed by Machining
Superintendent; upon completion of
part
repair, stamp boxes with review stamp, inspection id, and the date. 17 Upon final inspection Verify that
Inspection Order, print, parts and tags match;
fulfill inspection requirements specified in Inspection Order and
record results on Inspection
Order; coordinate with Operator* or
Machining Department
Material Handler to resolve any problem or
question, bringing Machining
Superintendent in as deemed
appropriate; for
any nonconforming parts identified, initiate a Discrepancy Report
and
retain for Machining
Superintendent per TOP-MOPPP;
if
non-conforming parts are found and are re-workable, make disposition to
rework; if a partial has been sent to Shipping, notify QA Manager to recall all
parts for 100% inspection. 18 As jobs are ready to
ship or return to Shipping for additional
processing Production Floor Traveler;
rest of MPS Job
Packet When satisfied that
product, documentation, packaging,
preservation, tagging and marking are correct, sign off on the
"machining" step of each container tag to approve the product for
sealing and delivery; stamp each container with green "Machined" stamp;
mark part count and location on the face of the Production Floor Traveler,
along with the scrap count; notify Shipping; stage product to be
picked up by Shipping and shipped per TOP-FINIS;
on
final shipment, give all documents in MPS
Job Packet to Machining
Superintendent
for final review. 19 As jobs are shipped Shipping paperwork;
Production Floor
Traveler; saved MPS
cover sheet Discard duplicate
print copies; scan all pertinent document
into the shared directory for retention per TOP-DOCUM;
when
final shipment has been made, review labor entries for accuracy and
correct as necessary; complete Job
Order status where appropriate.
STEP
WHO
WHEN
INFO TO USE
WHAT TO DO
Machining
Department Crib Attendant
Verify that
print revision is the correct one for the order; notify the Operator*
that the job is nearly ready to begin and verify that the preparations
are complete (verify that the machine choices on
Production Floor
Traveler are current); notify QC
Inspector to prepare for job in
accordance
with TOP-MOPQC.
11
12
Operator*
Container
full or at work center completion
Router/Traveler
and product
tag
Identify
the next operation to be performed and
identify back of product tag with next operation number.
* "Operator" may refer to a Machine Operator, Welder or other team position.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|