Scope: This procedure covers the marking and placement of forging dies and other die-specific tooling so that it can be easily located and identified.
Procedure:
STEP
WHO
WHEN
INFO
TO USE
WHAT
TO DO
1
Die Prep Helper
Whenever
handling tooling
Job
Order,
print or visual identification of tooling
Be sure the
full die number is clearly metal-stamped on the tooling in a spot that
is easily seen when the tooling is on a rack or the floor. For an
insert or multiple-impression die, the suffix must follow the die
number ("Z", "Y", "X" and so forth for insert holder ID; for multiples,
"D" for 2-at-a-time, "T" for 3, "Q" for 4, "F" for 5, and "S" for 6).
If tooling is shared by a group of dies then it either should be
stamped with all die numbers, or with some code assigned by VP-Quality & Engineering that he can trace back to all the dies that use
it.
2
Die Prep Helper
Whenever
storing tooling
Die number
stamped on tooling (if multiple, use lowest die number); Die Storage Log
If placing
in temporary storage on floor or such, position so die number can
easily be seen or clearly mark die number in paint stick so that it can
easily be seen; if storing in racks, store dies, trimmers, etc. in the
same space placing tooling on top of dies whenever possible; if tooling
is too large to fit on top of dies, then store beside dies as close to
dies as possible; write down all the information required by the Die Storage Log; (if any question as to organization of tooling racks, ask Die Prep Leadman)
3
Die Prep Helper
Whenever
retrieving tooling Upon finding tooling improperly marked or stored
Die number
stamped on tooling (if multiple, use lowest die number); own observation
Remove
tooling from rack; write down all the information required by the Die Storage Log Immediately report problem to a Die Prep Leadman or
Die Shop Supervisor
4
Die Prep Helper
At end of
shift
Die Storage Log
File Die Storage Log in Die Storage Log binder in Die Prep area; when there are
multiple die versions identify which die versions was used for the last
Job Order.
5
Die Shop Supervisor or his designee
Daily
Die Storage Log binder
Enter Die Storage Log information into the Tooling Program
LOSS OR DAMAGED DIES/TOOLING 6.1
Die Shop Supervisor or his designee Upon Damage or loss of dies/tooling Job
Order,
print or visual identification of tooling In
the event that any die/tooling is damaged or destroyed either during
production or storage. Immediately inform Engineering and Operations
Manager. 6.2 Forging Engineer, Operations Manager Notified of damaged or loss tooling Production Report Immediately
evaluate the dies/tooling to determine a recovery plan. Once a plan has
been determined, notify customer of any potential damages or time
loss. RECLAIM OF DIES/TOOLING 7.1 Engineering Assistant, VP of Quality and Engineering 2 years since previous run Job History When
the need to reclaim a die has been dertermined, reiew the history of
the tooling to insure a minimum of 2 years has passed since the most
recent PO. 7.2 VP of Quality and Engineering, Operations Manager Upon determining a Die/Tooling is eligible for reclaim Job History Once
determined that a die can be reclaimed. Reach out to the customer to
determine if any future orders will be placed. If none foreseen at this
time, disposition die to be reclaimed. 7.3 Engineering Assistant Upon receiving disposition to reclaim die Email Create T-JO to reclaim die.
Insure steps are placed in router to remove current die impression
*If die is to be re sunk with a different impression, then previous impression will naturally be removed. DISPOSAL OF DIES/TOOLING 8 Engineering Assistant When die/tooling is no longer usable Die review If
die/tooling has been damaged or is no longer functionally useable,
create a T-JO to remove current impressions. Once current impressions
have been removed, dies/tooling may be scrapped with current forging
flashing.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
07/30/2021 |
Updated section 6, 7, 8 to detail control of dies/tooling. |
Dustin Jump |