Trinity Operating Procedures - TOPs
TOP-SECTL: Secondary Tooling Inspection
Rev: 12/06/2017
Scope: This procedure covers the inspection and storage of tooling or tooling related casts (dimensional representations of an impression taken by pouring plaster or other material directly into the impression or scanning of the die) related to post-forging manipulation of part dimensions including hot or cold.
Procedure:
*"
Forging Engineer"
refers to the member of the
Engineering Department assigned the die in question. If there is any
question as to which
Forging Engineer is assigned a particular die, the
VP-Quality &
Engineering decides.
STEP
WHO
WHEN
INFO TO USE
WHAT TO DO
1
Die Shop Helper
Upon
receiving a newly (re) sunk or questionable hot pad die, re-strike die,
or cold coin die
Die
number on tooling die; own observations
As
designated by
Forging Engineer through email or Job Order take
required
cast
impression or prepare tooling for scanning; forward cast or tooling to
CMM Programmer/Operator;
label each impression cast with die sinker
name, die number, Job
Order Number (P.O. Number for outside vendors);
date, shim and impression (for multi-impression dies)
2
CMM
Programmer/Operator
Within
2 days of receiving cast or tooling
Forging
Print with Engineering notes on die sink tolerances
Thoroughly
inspect dimensions of cast (typically using CMM) or actual tooling; If
scanning, apply anti-glare spray to tooling for laser scanning with
portable scan/measuring inspection arm; prepare Cast Report
or Scan
Report
highlighting any out-of-tolerance
readings and forward the report to
Forging Engineer
3
Forging Engineer*
If
cast or tooling is disapproved
Cast Report or Scan Report; Forging
Print
Determine
degree of changes needed to tooling or hot pad die repair; stamp
"Reject" on Cast Report
or email rejection of Scan
Report;
temporarily hold Cast
Report or Scan
Report unless in own
judgment tooling repair is too minor to justify another inspection;
destroy disapproved cast and after tooling is corrected go back to step
1
4
CMM
Programmer/Operator
If
cast or tooling is approved
Cast
or Scan Report
Stamp
"Accept" on Cast Report
or email Scan
Report approval, notify Forging Engineer and file report
in Engineering files; if
cast made forward cast to
Engineering Assistant for storage.
5
Engineering Assistant
Upon
receiving cast
Cast
If
a cast was made; verify cast marked with die number, date, die sinker
and "HOT PAD DIE", "RE-STRIKE DIE" or "COLD COIN DIE"; store cast in
cast cabinet after discarding or marking casts already in cabinet as
"OLD HOT PAD DIE", "OLD RE-STRIKE DIE", or "OLD COLD COIN DIE"
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|