Trinity Operating Procedures - TOPs
TOP-AFTFG: After Run Die Procedures
Rev: 12/06/2017
Scope: This procedure covers the steps followed with the dies and other tooling after a forging job is complete.
Procedure:
*An
engineer
can make decisions for repairs in the same capacity as the
Die Shop Supervisor when called upon.
STEP
WHO
WHEN
INFO TO USE
WHAT TO DO
1
Hammerman and crew
Before
setting up next job (or as directed by
Production Supervisor
or Production Leadman)
Production
Floor Traveler
Take
forging dies out of hammer, be sure
Production Supervisor
or Production Leadman
is aware of set up; make sure no parts are left behind the hammer and
no billets are left around the furnace.
2
Die Prep
Helper
As notified
Verbal
notification from Production
Go to
hammer; pull any trim or other tooling out of presses; take dies and
other tooling back to Die Prep area (or directly to Die Shop if so
directed); take Production
Floor Traveler to Die Prep for review.
3
Die Prep
Team Member
After dies
cool off
Personal
experience
Open dies
up and clean dies and other tooling if needed; contact Die Shop Team
Member to inspect dies or tooling; take Production Floor Traveler
to
Production Supervisor
's office for filing.
4
Die Shop
Team Member
As
requested to inspect dies or tooling
Visual
inspection
Review
overall condition of dies or tooling; look for excessive wear or
impression damage; if problems found take notes and contact
Die Shop Supervisor.
5
Die Shop Supervisor
After a
problem (defect or damage) is reported
Visual
inspection of the defect/damage
Make a
decision as to disposition and note it in an email to the Forging Engineer
assigned to the die in question. Also note it in a daily shift change
e-mail.
6
Forging Engineer*,
Die Shop Supervisor
After die
inspection is complete
Visual
Inspection
Make a Job
Order to schedule repairs; if the corrections needed will
take less
than 24 hours and will be done immediately, a Job Order is not
required. When repairs are complete have a Die Prep Team Member make
dies or tooling ready for storage.
7
Die Prep
Helper
After dies
and other tooling are ready for storage
By
observation
Apply
plastic coating (or other rust preventive) as needed for outdoor
storage to dies and other tooling and return them to proper slot in
storage racks; log any dies or tooling location in Die Storage Log Sheet; also
enter in Tooling Program.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|