Trinity Operating Procedures - TOPs

TOP-RREVU: Resink Review

Rev: 12/06/2017

Scope: This procedure describes the actions taken by which dies are identified as needing review. The process used is for planning to repair or resink dies and/or tools. Re-sinking is the ideal time for including all improvements as there is typically little or no extra cost.

Procedure:

STEP WHO WHEN INFO TO USE WHAT TO DO
1 Production Supervisor QC Supervisor, QC Specialist, QC Inspector, Die Prep Helper or Die Shop Helper Any dies identified as needing repair or re-sinking Last parts; own or other observations Notify Die Shop Supervisor (if absent, Die Shop Leadman) of problem by *e-mail or IPR; send copy to the Forging Engineer assigned to die/tooling customer and Engineering Assistant; move dies/tooling in question to quarantined area for review.


*Use email on very minor repairs only.
2 Die Shop SupervisorQC Supervisor, and Forging Engineer As needed Last part; Last Part Inspection; information from Quality Control records Review dies/tooling in review area; make decision to resink or rework; notify Die Shop personnel of the actions to be taken; notify Engineering Assistant to write Job Orders
3 Engineering Assistant Verbal or email communication of need to write Job Orders Verbal or email communication; own knowledge; IPR Write Job Orders (see TOP-DIMKR or TOP-SINKR) per instructions and own knowledge of situation
4 Die Shop Helper After notification from Die Shop Supervisor Verbal notification Move dies to be re-sunk or reworked into repair racks

Revision history:

Release Date

Description of Change

Owner

Approver

12/06/2017

Updated to comply with revised Quality Manual and new TOPs format.

Tim Ellis

Todd Sheppard


















Documents are controlled only when viewed on-line at trinityforge.com in the original English -- printed copies or translations are not controlled documents.