Trinity Operating Procedures - TOPs
TOP-PRINT: Forging/Machining Engineering Prints
Rev: 01/08/2021
Scope: This procedure covers development, approval and control of formal drawings, which affect the quality of product, such as forging, die and machine drawings. Simple concept sketches are not covered.
Procedure:
STEP | WHO | WHEN | INFO TO USE | WHAT TO DO |
FOR INTERNAL PRINT CHANGES OR NEW DIE PRINTS START IN STEP 4 | ||||
1 | Anyone | Upon receiving Customer Print | Print received | Immediately pass print to Customer Service Representative |
2 | Customer Service Representative | Upon receiving Customer Print | Customer Print; Engineering file | If same revision as shown in computer, send to Engineering Assistant; if different revision than shown in M2M, place information in Print Review Spreadsheet; if an order was received with the print, see TOP-ORDER |
3 | Engineering Assistant | Print Review Spreadsheet is updated | Print Review Spreadsheet | Send out the Print Review Spreadsheet breakdown every Tuesday, Friday and any other day where an update is warranted. |
4 | Forging Engineer* or Manufacturing Engineer | Upon receiving notification of an update in Print Review Spreadsheet | Print Review Spreadsheet and any associated print; Engineering Files | Review indicated print revision to determine degree of change; if no previous Customer Print on file; describe degree of change on Print Review Spreadsheet; if change does not affect our process note in Print Review Spreadsheet; if change requires a modification to the dies or other tooling, indicate it on Print Review Spreadsheet to initiate quote process per TOP-QUOTE |
5 | Forging Engineer or Manufacturing Engineer | As needed to make formal or revise current drawing | Tooling Job Order; CAD File; possibly legacy hand drawing | Note: Any
print update requires reviewing of all applicable prints. If existing drawing, use master CAD File from server if not an existing drawing; begin a new CAD File; make drawing per request, working out details internally and working with our customer to identify key characteristics of the forging (when not already known from history); discuss any opportunities for improvement or get any information needed from other team members; if modification to existing hand drawing, add new revision level and carefully track and initial all changes on revision block; for new drawing (or re-draw) establish and initial title block; if using CAD, plot/print drawing; submit drawing to another Forging Engineer for review . |
6 | Forging Engineer or Manufacturing Engineer | Within 48 hours of receipt of notification of a pending Print Review Spreadsheet entry | Print Review Spreadsheet breakdown email; Print Review Spreadsheet; storage folder for print reviews; associated print and/or Engineering Files |
Review the
necessary information to determine the required degree of change; if
there will be no effect on our process and no changes are necessary
update the Print
Review Spreadsheet accordingly; if the print is better
than the existing viewer print and no change is indicated per step 4,
forward the print to the
Engineering Assistant as a replacement print;
for new prints where no previous print exist, new revisions of existing
prints, or requested modifications to existing prints update
the Print
Review Spreadsheet; forward to the
Engineering Assistant. (See Step 10)
NOTE: For all prints placed in the Viewer Approved Folder; for indicated modifications to the dies/tooling or machine/forge process update the Print Review Spreadsheet to initiate the Quote process per TOP-QUOTE. |
7 | Forging Engineer (other than one in step 5) | As given drawing to review | Drawing provided by an Forging Engineer plus any source documents he/she can provide | Review for approval another Forging Engineer's drawing as appropriate; if disapprove, return to that Forging Engineer stating reservations either verbally or marked on drawing; if approved; electronically initial revision "Appvd" block of reviewed print; for new dies initial on "Chk'd" block of new print. |
8 | Forging Engineer | Upon receiving peer-approved drawing | Approved drawing | Verify that drawing is properly approved; determine whether customer or vendor print approval is required. |
IF Customer Print APPROVAL NOT REQUIRED, GO TO STEP 15 | ||||
9 | Forging Engineer | Upon finishing new master drawing | Internally approved Forging Engineer's directions | The print gets emailed to Customer Service, to be send to the customer. |
10 | Customer Service | After receiving print from Forging Engineer | Updated Print Review Spreadsheet; M2M Customer Info | Send print to customer; file papers; place copy of cover letter in Print Follow-Up File. |
11 | Customer Service | Upon receiving customer response back | Response from customer (letter, print, etc.); Print Follow-Up File | E-mail customer's approval/ disapproval; file print or cover letter (if any). |
12 | Forging Engineer | Upon receiving customer response regarding print (dis)approval status | Customer response, including any print | Notify Customer Service if any customer change may have pricing implications; determine next step |
13 | Forging Engineer | IF PRINT IS DISAPPROVED BY CUSTOMER | Cover letter; print; Customer Print, sketch, sample or specifications | Determine degree of changes needed to print (go back to Step 4) |
14 | Forging Engineer | Customer approval of a drawing | Approved drawing | Prepare CAD and viewer files for production; place in the viewer approved folder and enter the information in the Print Naming Convention Spreadsheet; forward CAD files and approved drawings to Engineering Assistant. |
15 | Engineering Assistant | Upon receiving approved drawing and Viewer File | Approved drawing and Viewer File | Put drawing in Engineering Print Files; Viewer File and assign proper print status in viewer. |
PRINT DISTRIBUTION | ||||
16 | Engineering Assistant | Daily | Files in the Viewer Approved Folder | Review the Viewer Approved Folder; if new files are listed and there are corresponding prints in the Viewer Approved Folder rename the files in the Viewer Approved Folder; once the prints are renamed, follow the instructions listed for each print. |
REDLINING PRINTS | ||||
17 | User of controlled print copies | As need to "redline" copy | Print copies and other info | Pencil in notes or figures as needed on print, initialing and dating each such "redline" and, if redline changes any data originally on the print, include the reasoning and authority behind the change [note: redlines made prior to 4/93 did not require initialing and such]; if redline info needs to be added to print, notify Forging Engineer*. |
PRINTING PRINTS | ||||
18 | Anyone | As needed to print out approved prints from viewer | Print copies; stamps (located by the Engineering printer) | When a print is needed for a specific job, stamp it with the "Approved for" stamp and write in the job, date printed and printed by information; when a print is needed for any other reason, use the "Approved for 3 weeks from" stamp and write in the date printed and printed by information |
* Forging Engineer is the engineer assigned to the customer
Note: "Customer" could be whoever is responsible to approve either a Forging Print or a Machining Print (i.e., customer could be our own Machining Department)
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
01/08/2021 |
Updated to replace Engineering Assistant with Customer Service line 9,10,12, 13. Delete line 11 |
Dustin Jump |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|