TOP-POSQC: Post Process Quality Inspection
Rev: 2/14/2024
Scope: This procedure covers Forging Division post-process quality inspection.
Procedure:
NOTE:
For any grinding use the Grinding
Verification Log to
state a visual inspection was performed on the work in process.
STEP
WHO
WHEN
INFO
TO USE
WHAT
TO DO
1
QC
team member
After
job is completed
at forging level and prior to post forge inspection
Production
Floor Traveler
Make a
copy
of required inspection documents, if deemed necessary; If during
production there is a change of production equipment, blow pattern, or
tooling, document the change on the Production Floor Traveler
2
Post
Forge Helper
During
post-production
Production
Floor Traveler;
parts container tags;
Blueprint(s);
Verify
container tags; perform inspection per Production Floor Traveler;
notify QC Supervisor
or Post Forge Supervisor
if
there are any
questionable parts or steps referring to "as needed" (usually grinding
or stamping) go to step 2a.
2a
Post
Forge Helper
Questionable
part(s) to be
reworked
Sample
of a questionable
reworked part that has been tagged and placed in the Post
Forge office by the QC
Supervisor or Post
Forge Supervisor
Perform
rework using a reworked sample part;
re-inspection will be required per step 3
3
QC
Supervisor or Post
Forge Supervisor
Upon
notification from Post Forge team member that parts must be re-inspected
Production
Floor Traveler;
parts container tags;
Blueprint(s);
Re-inspect
parts, assuring grinding or stamping is satisfactory; approve with
inspection stamp; complete inspection by having container tags properly
placed, Production Floor
Traveler marked properly and placed in a
folder in outbox. Note: a post production process is delayed until
approval is given
4
QC
team member
During
post-production: at beginning of process, or as major changes are made
Production
Floor Traveler; parts container tags; Blueprint(s);
Production Floor
Traveler
Perform
random inspection, or by manager's instructions; get documented
approval from QC Supervisor
to omit any steps; when
bad parts
are found in random sampling plan, go to
100% inspection or other plan specified by QA Manager; if defective
parts continue to be produced, stop the process; make Yellow HOLD tags
for
containers at the hammer, include job number, heat code and description
of the problem
STEP
5-8 REFERS TO THE COMPLETION OF INSPECTION FOR ANY PROCESS
5
QC
Inspector III
Upon
completing inspection of all parts in forging or post-production step
Production
Floor Traveler; tags on parts containers and drawings
Perform
random inspection of parts visually or dimensionally; use
a Part
Inspection Sheet for inspection data; verify that
inspection step is complete, including container tags.
6A
QC
Inspector III
If parts pass final inspection and are conforming
Production
Floor Traveler;tags on parts containers and drawings
If all production steps have been completed, deliver Production
Floor Traveler per TOP-FINIS.
6B
QC
Inspector III
If parts pass final inspection and are non-conforming
Production
Floor Traveler;tags on parts containers and drawings
Write up a Rejection
Notice and email to Production Supervisor and QC
Supervisor and any other parties that need to be informed; Place a copy of the Rejection
Notice with the parts; Tag any questionable parts or tubs with a Red Disposition Tag clearly and visually identifying who, when and why for the hold. Have parts immediately moved to MRB/Customer Return Area.
If production Traveler or QC Print identifies parts as Nuclear or states 10CFR21 (note sections 21.21 thru 21.62) applies, notify QA Manager immediately.
Note:
A red tag denotes whether the parts are on hold or need rework and
should be marked accordingly. The tag shall be signed and dated each
time the status is changed.7 ONCE REJECTION NOTICE HAS BEEN SENT AND PARTS HAVE BEEN MOVED TO MRB, PRODUCT WILL FOLLOW THE PROCEDURE OUTLINED IN TOP-NOCON BEGINNING AT STEP 3.
8
QC
Inspector III
Upon
receiving Rejection
Notice waiver disposition
Rejection Notice
waiver disposition
Follow
Rejection
Notice instructions and buy off parts after re-work or waiver
verification
9
QC
Supervisor or QC
Inspector III and QA
Assistant
After
job
completed
QC
Folder containing Shop
Floor Traveler, QC Print, and Part
Inspection Sheet
Review
QC Folder to ensure all steps have been completed; review scrap rate
and Part
Inspection Sheet for Non-Conforming parts; determine if a
Corrective Action
Report (CAR) or
Internal Process Review (IPR)
is needed.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
1/15/2021 |
Updated to add yellow hold tag on line 4. |
Dustin Jump |
Todd Sheppard |
2/14/2024 |
Added step 6A and 6B, Removed steps 6 and 7, aligned with TOP-NOCON |
Dustin Jump |
Todd Sheppard |
|
|
|
|
|
|
|
|