Trinity Operating Procedures - TOPs
TOP-MOPPP: Machining Department Operations
Rev: 02/16/2024
Scope: This procedure covers the performance of individual operations within the Machining Department as well as the associated runtime quality control. "Operations" include machining, grinding, welding, stamping, cleaning, and so forth.
Procedure:
*"Operator" may refer to
Machine Operator, Welder or other team position.
STEP
WHO
WHEN
INFO TO USE
WHAT TO DO
1
Machining
Department Supervisor
As need to assign
operator(s) to a job
Machining
Schedule;
Production Floor
Traveler; rest of MPS
Job Packet; own judgment
Determine what
tasks need to be accomplished and what resources are available; confirm
which machines are to be used for routed tasks and which operators are
to be assigned (be sure that operator expertise has been established
per TOP-TRAIN);
notify each operator which machine(s) he/she is to operate and which
operation is to be performed; be
sure each team member has the appropriate Production Floor Traveler,
tools, fixtures and materials; answer questions and solve problems
2a
Operator*
Upon receiving
assignment to perform operation
Machining
Department Supervisor's verbal instructions; Production
Floor Traveler; print
and
rest of MPS Job
Packet for machining (see TOP-MORDR)
Verify that
Production Floor
Traveler packet is complete and matches assignment; if
for any reason you do not believe you are qualified for the assignment,
notify Machining Department
Leadman; coordinate with Machining
Department Material Handler
for material to be delivered to work area; if needed, coordinate with
Machining Department
Programmer for CNC
Program to be downloaded to machine; verify that kit
is correct and complete; verify that machine is operational.
2b
Production
Welder
Upon receiving
parts and set-up to perform welding
Production
Floor Traveler; parts; print; gauges; own knowledge
Verify that print
and part match; that the Production
Floor Traveler is in good order and
that the machining has been properly completed; examine part
against print, assure air/gas mixture meets customer's Welding Specifications;
use gauges and/or measuring equipment per TOP-MSURE
and TOP-CALIB
to verify parts are being assembled to print; coordinate with Machining
Superintendent
to resolve any problem, bringing Machining
Department Supervisor or Machining
Superintendent in as deemed
appropriate; all completed parts are recorded in the Assembly Process
Log for traceability of welded components; turn any
nonconforming or
questionable parts produced over to the QC Inspector
with Discrepancy
Report at the end of each shift.
3
Machining
Department Material Handler
As jobs require
material (typically forgings)
Machining
Department Supervisor's verbal instructions; Production Floor Traveler;
container tags
Transfer forgings
or other materials from storage to work area; verify that
container tags are correct; as operation progresses, keep
materials supplied
4
Machining Department Programmer
As jobs require
program download
Machining
Department Supervisor's verbal orders; Schedule
Verify program
matches information on schedule and is correct for the machine to
receive program; download to machine
5 Operator* Initially when setting up a machining operation Production
Floor Traveler; print and rest of MPS
Job Packet Validate all gages to be used on operation are available and ready.
Make sure all gages have calibration stickers and are within the calibration date prior to use.
Validate that the measuring verification log has been filled out, if not fill out and notify QC immediately.
6
Operator*
Upon setting up a
machining operation
Production
Floor Traveler; print and rest of MPS
Job Packet
Read operation
instructions, Production
Floor Traveler; review any setup photos;
verify that heat code on material tags matches heat code on Production Floor Traveler;
set up the machine; if a CNC
Program is
involved,
verify that the program and revision match hard copy in MPS Job Packet; run
test part(s), check for correctness (see TOP-MSURE
and TOP-CALIB)
and make any necessary adjustments; If any raw material is found to be
out of specifications, notify the Machining
Superintendent for
disposition and to assess the need for a CAR
initiation (See TOP-CARRR)
when first correct part is produced, document dimensions on Inspection
Records; take part with Production
Floor Traveler and have QC
Inspector
verify and document all dimensions being machined; may have to perform
this step multiple times to achieve buy-off; involve Machining Department Supervisor
as deem appropriate or as appropriate by
Production Floor
Traveler; turn all scrap or questionable parts over to
QC Inspector
with Discrepancy
Report
at the end of each shift
7
Operator*
Upon receiving
parts for inspection
Inspection
Order;
Inspection
Records; Production
Floor Traveler; part; print and rest of MPS Job Packet; own
knowledge
Verify that
Inspection Order, print and part match; verify that Production
Floor Traveler packet is in good order and that the operator
has properly
completed his/her section of the Inspection Records;
select measuring
equipment per TOP-MSURE
and TOP-CALIB;
examine part against print per Inspection
Order; verify that part meets
specification and that operator's measurements (and, for welding, gage
settings) are correct; coordinate with Operator to resolve any problem,
bringing Machining Department
Supervisor or Machining
Superintendent in as deemed appropriate; upon first-part
buy-off, record
results in Inspection
Records then return documents to Machine
Operator; for nonconforming parts produced subsequent to first part
buy-off, scan off job in M2M.
8
Operator*
As run operation
Inspection
Order,
Production Floor
Traveler; print and rest of MPS
Job Packet for operation
Keep equipment and
work area safe and clean; immediately report any machine or welding
equipment malfunctions to Machining
Superintendent, Machining
Department Supervisor, or Maintenance
Man; produce parts per Production
Floor Traveler;
ink stamping of operator ID is required; use personal
"logo" stamp (per TOP-STAMP);
keep all parts containers and loose parts tagged (be sure the container
you are working from, and to, has a QC tag on it; if
the containers do
not come out even, create or destroy the extra QC tags); perform
quality control as specified in Inspection
Order; during the processing
of any Job Order
requiring assembly, exercise extreme caution to assure
assemblies are free of any debris or foreign objects as they are being
closed or sealed: scan all time spent and part quantity machined into
M2M; present
any suggestions for improvement of the operation to
Machining
Superintendent or Machining
Department Supervisor or Machining
Department Programmer
9
Machining
Department Supervisor or Machining
Superintendent
As deemed
appropriate during course of job
Own judgment; any
documentation deemed appropriate
Observe running of
operation; verify that documents are correct and that part is being run
per plan; verify that Inspection
Records are being maintained; review
with the Operator and possibly other team members how the operation
could be improved.
10
Operator*
As discovers
nonconforming parts
Own judgment; any
documentation deemed appropriate
Fill out Discrepancy
Report and take parts to QC
Inspector per TOP-MOPQC.
11
Machining
Department Material Handler
As containers of
machined parts are completed
Production
Floor Traveler; container tags
Ensure that
containers are properly tagged; forward containers to QC area until
final buyoff is performed; confirm signed Production Floor Traveler
is
attached to container; mark all boxes with a green M; move container of
parts to storage area; observe TOP-MORDR
for warehousing and (if complete) transfer to Shipping; for
partially-machined parts, ensure tags clearly indicate the stage of the
parts' progress
12
Operator*
As the end of job a
is reached
All documents and
remaining materials
About 2 hours
before you expect the job to finish; notify the Machining Department Supervisor
and the Machining Department
Material Handler; when last part is
complete, clean up tools and machine; return tools to crib as
appropriate; complete job per TOP-MORDR;
leave work area in a clean and safe condition; alert Machining Department Supervisor
you are moving to next assignment; scan off job
in M2M.
13
Operator*
When machine is
unable to operate properly for any reason
Own observation
Scan downtime in
M2M; notify Machining Department Supervisor
or Maintenance Man.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
02/16/2024 |
Added Step 5 |
Dustin Jump |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|