Trinity Operating Procedures - TOPs
TOP-RECRM: Receiving Raw Metals
Rev: 01/28/2020
Scope: This procedure covers the steps involved in receiving steel or other metals to be forged or machined*.
Procedure:
*For
simplicity sake, all places in this TOP that refer to steel will be
understood to include any metal used in forging and machining.
STEP
WHO
WHEN
INFO TO USE
WHAT TO DO
1
Steelyard Specialist, Steelyard Leadman or
Steelyard Helper
Steel
arrives on truck
Packing
list, vendor steel tags, Purchase
Order for raw
material
Before
unloading truck
compare packing list to the
Raw Material Purchase Order to make sure
the steel received is the steel ordered; check packing list against
vendor steel tag to ensure tag matches the packing list; check packing
list to mill heat number stamped on end of the bars (when available);
check diameter of each bundle; check for seams; sign
packing list; weigh each bundle and record data on packing list; unload
steel from truck; put steel in bins; paint ends of the steel using the
Forging Material
Reference List (if weather or other
conditions prevent immediate painting, retain a copy of receiving
paperwork until conditions allow painting); put the steel
assigned bins on receiving paperwork; send packing list, bill of
lading, Material
Certifications to Materials
Manager.
If
seams are found place a hold
tag on the bundle, put the
steel in the hold bin; call QC
Inspector to inspect seams or roll marks
to verify depth; initiate raw material non conformance procedure (TOP-RMNON).
2
Steelyard Supervisor or
Steelyard Specialist
Receive
packing list
Packing
list, Pre-made Bundle
ID Stickers,
Raw Material Purchase Order in computer system, Material Certifications
Before receiving material, verify that the original mill raw material
certification has been provided by the steel vendor. If you do not have this,
contact purchasing and the Steel vendor to request this information. Once the
original raw material cert has been verified, enter
heat
number information into M2M (the
computer system will generate the next heat number). Enter bundle,
M-Part number, weight, other criteria such as mercury-free, no weld
repair
statement or country of origin and receiving information into M2M. Verify that this information had been correctly
entered into
the computer system. If raw material certifications indicate that the
material does not comply with the requirements on either the
Raw Material Purchase Order, SPEC ID or the M2M Material Master,
investigate
any discrepancy and determine what action is required. If new heat
number, enter chemistry into Heat Code information in M2M;
send Steel
Stickers to be placed on the bundle tags
with the lot
number, size, grade, heat code, weight, and vendor
3
Steelyard Supervisor
or Steelyard
Specialist
Receive
steel invoice
Invoice,
packing list certs, Material
Certifications
Enter
steel
info from stickers on packing list into M2M;
enter per pound price for each bundle in the computer; match up invoice
with the receiver; verify that invoice is correct; assign G/L to
invoice; forward invoice and receiver to A/P
Clerk to be processed (invoice may be electronically send from vendor to A/P Clerk); stamp heat
code on Material
Certifications
and file in mill test report files; scan into
the Mill Certs Directory
on the server
4
Materials Manager
As
job is processed
Industry,
and Customer
Specifications. Open
PO Folder, M2M, Material
Certifications
Check
raw Material
Certifications
against the requirements
for the appropriate specification in M2M;
f raw material does not comply with
the requirements for the appropriate specification investigate the
discrepancy and determine what action is required
5
Steelyard Specialist, Steelyard Leadman,
Steelyard Helper
Steel
Stickers are received
Steel
Stickers
Verify
information
Issued by M2M on
the Steel
Stickers
is the same as the information on
the mill tags; place stickers
on Trinity tags; place tags on raw
material
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
06/29/2018 |
Updated to add original raw material certificate requirements. |
Amber Esparza |
Todd Sheppard |
1/28/2020 |
Updated step 3 to add invoice may be electronically sent from vendor to A/P Clerk. . |
Dustin Jump |
Todd Sheppard |
|
|
|
|
|
|
|
|