TOP-JSTRT: Starting a Production Forging Job
Rev: 07/16/2020
Scope: This procedure covers the production steps to determine that a forging job needs to be run and the steps to get it started.
Procedure:
STEP
WHO
WHEN
INFO
TO USE
WHAT
TO DO
1
Production Scheduler
Demand for
a Job Order
appears in the Job Order
Queue in M2M
M2M
Job Order
Queue;
PDF file of Customer Purchase Order
Determine
which Job Orders
need released, quantity, any special instructions; if
customer requires their heat code, edit BOM,
All orders need, at least, two setup parts (min) plus all
required additional test parts. It is critical for orders below 150 to
use this criteria. Notify Steelyard and Die Prep if "rush job".
2
Production Supervisor
As
soon as possible as production needs change
Shop Schedule; Traveler;
personal knowledge of production resources
Decide
to start preparation for a forging job (sometimes based on what is
currently stamped in die and/or print); assign first article part
number per TOP-QARTI;
verify the hammer blow
pattern is printed on the Traveler.
3
Steelyard Leadman
Upon
receiving BOM
Traveler;
M2M inventory
data
Carefully
verify the BOM
and Router;
report any problems or questions back to
Forging Engineer
or
Production Scheduler;
if chemical check analysis is required, initiate TOP-CHEMC;
Print
Pick List; determine first lot to cut for the job; pull the
bundle up to the
shear or saw; write the bundle and heat code on the Traveler in
large black letters and initial it; add heat code to Traveler in
computer; print Traveler
in Steelyard office; begin cutting steel. (TOP-CUTIT)
4
Die Prep Helper
As
determine that a die needs to be prepared (may be because of Traveler,
call from
Production Supervisor
or simply Shop
Schedule)
Shop
Schedule; print or notes from computer or hard copy; Traveler; Material
Reference List; QC
Print
Pull
the die from the racks (or from Die Shop); if there are multiple die
versions, verify the die version pulled matches BOM; open die up; clean
and
polish dies and other tooling; repair any minor damage that you can;
notify
Production Supervisor
, VP-Quality
& Engineering, Production Scheduler or Die Shop Supervisor if there are
problems you cannot quickly fix; take QC
Print and Traveler
to the
hammer; (DO NOT IGNORE ANY DIE OR TOOLING PROBLEM AND LET IT GET TO THE
HAMMER); determine the correct lettering and stamp it in the die or use
clay to read numbers and letters to avoid seeing a mirror image; if
tooling for hot stamping is needed, send Traveler to Die Shop Die Preparer
for assembly and check (see steps 5-9); insert the stencils (IF YOU
HAVE QUESTIONS, ASK!); get Traveler
from Steelyard office; sign the
Traveler;
call the Die Prep Leadman to
verify the die and lettering and be sure they co-sign the Traveler; scan
stamping approval into M2M;
take the Traveler, die,
and other tooling to
die preheat furnace nearest hammer to be used; preheat to 400° F
minimum; pre-heat trim tools.
5
Production
Leadman
At
heat code change (when hot stamping is used)
Shop Schedule; Traveler
Call Die Shop and inform Die Shop Helper
of need for heat code change;
determine if change can be done at the press or if the tooling needs to
be taken to the die shop; if tooling needs to be taken to Die Shop
provide them with the Traveler.
6
Die
Shop Die Preparer
Upon
receiving Traveler
on a hot stamping job; do not continue unless
Traveler is
available
Traveler;
QC Print
Assemble
heat code for hot stamping; if forge die is not in Die Shop, notify Die Prep Helper that hot
stamping tooling is ready; if forge die is in die
shop; notify QC Inspector
to check tooling; notify Die
Prep Helper to
pick up die.
7
Die Prep
Helper
Upon
notification that tooling for a hot stamping job has been prepared
Traveler
If
forge die is in die prep area, retrieve hot stamping tooling from Die Shop,
notify QC Inspector
that tooling is ready to be checked; If both die
and tooling were in die shop, retrieve assembled and checked die from
die shop.
8
QC
Inspector
Upon
notification that die or hot stamp tooling has been
prepared
Traveler;
QC Print
Verify
all stamping to the print and Traveler
are clearly visible and
correctly stamped; review condition of die/hot stamp tooling; if
approve, initial or stamp Traveler
and return Traveler
to Die Prep Helper;
if not approved notify Die Prep
Leadman to redo all stamping to
match QC Print
and Traveler
until approved by QC Inspector.
9
Die Prep
Helper
When
Traveler is
returned from QC Inspector
Traveler
If
hot stamp punch was assembled and checked in die shop, pick up
hot stamp tooling.
10
Production Supervisor
Upon
determining the need to change the planned production sequence of heat
codes for a die after the Traveler
has been initiated
Own
judgment; Traveler; Container Tag
Match
what the Traveler
has generated and what containers of material have
been cut; change the Traveler
and tags as necessary to ensure they
reflect the desired production sequence.
11
Production Supervisor
Traveler completed
Any
changes to Router
steps
Forward
to VP-Manufacturing; request updated Router
12
VP-Manufacturing
Request
made for Router
changes
M2M past
run history
Approve
changes to
Router;
forward to Forging Engineer for Router
update.
13
Forging Engineer
Router
change
approved
Standard
Router; Traveler
Update
Standard Router
information; destroy Traveler
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
12/06/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
07/16/2020 |
Updated to add criteria for orders below 150 to step 1. |
Dustin Jump |
Todd Sheppard |
|
|
|
|
|
|
|
|
|
|
|
|