Trinity Operating Procedures - TOPs
TOP-FINIS: Control & Shipment of Finished Product
Rev: 1/30/2019
Scope: This procedure covers the control and shipping of parts after all processing steps have been completed and the parts are ready to ship.
Procedure:
Verify
that
inspector(s) have stamped all steps on the Traveler
and the inspection label;
make Shipping Memo;
refer to
TOP-BLAST
and choose container size appropriate for amount of goods to be
shipped
ensure that parts containers are properly tagged; use copy of print to
identify parts; if required by Shipping
Memo, transfer parts* to
special or customer-supplied shipping container; when removing parts
from inventory, do an inventory transfer (M2M)
to move parts to the
designated area; take parts to the appropriate area; when removing
parts from the racks spray paint over the piece count and gross weight;
(only Shipping can remove parts from the
racks); Inspector's label MUST
be attached to container identifying inspector responsible for product
that went inside a specific container - see
TOP-QCTRL);
stamp Shipping Memo
and return Traveler
to QC daily; check scale and
fill out Daily
Scale Checklist (have scale repaired if needed before
weigh-counting); weigh-count parts, (weigh-count tolerance is + or - 1/2%);
after inspection or re-work
is completed re-weigh each container
placing the correct information on the container; upon verification
that parts are correct, move parts to warehouse or, if to be shipped
immediately, to loading area; give Shipping Memo
back to Shipping Clerk;
the Shipping
Memo
must reflect changes when parts have been added to or
taken out of a container; transfer parts back into
the finished goods inventory; for stock orders, or as
specified by
customer, line containers with plastic bags; fill container with parts,
then add packet of desiccant; close container; at this stage, if a
sample box is made only QC personnel may remove items from the sample
box; put the parts back in the designated bin on the racks. IF
PARTS TO SHIP IMMEDIATELY, SKIP TO
STEP 9. NOTE...STEPS
09 - 17 MAY BE STOPPED BY ANY SUPERVISOR, MANAGER OR OFFICER. Upon
being notified that a job
requiring manual certifications is being readied for shipment
STEP
WHO
WHEN
INFO
TO USE
WHAT
TO DO
1
Shipping
Clerk
Daily
Shipping
queue (M2M)
Using
shipping
queue, watch due
dates and status of
all jobs getting close to ship date.
2
Shipping Helper
Upon
receiving completed
Traveler
Container
tags;
shipping
queue (M2M); or Production Outlook;
Traveler;
copy of
forging or QC Print; Daily Scale
Checklist
3
QC
Inspector
After
all processing and test
steps are complete
Traveler;
copy of Forging Print;
QC Supervisor's
instructions
Verify
that all steps have
been successfully
completed on the Traveler;
perform AQL
dimensional visual sampling per
TOP-POSQC;
place green dot on container with employee stamp; any non-conforming
part will be dispositioned per
TOP-NOCON;
approve for shipment by stamping off on Traveler with employee
stamp;
place in packet and put in inventory box in the Shipping office.
4
Shipping
Clerk
Upon
receiving Traveler
and
copy of print
Shipping
queue (M2M);
Jobs Info; Traveler;
copy of
forging or QC Print;
Shipping Memo
Verify
that all prior steps
from Traveler
have been
completed; if job is due, set up and stamp for shipment.
5
Shipping
Clerk
Upon
receiving completed
Shipping Memo
from QC Inspector
after QC final buyoff
Shipping Memo; Job Order; Blueprint
Verify
count from all outside
vendors; any
discrepancies notify Post
Forge Supervisor; enter weights & counts into M2M;
dispose
of Traveler
6
Shipping
Leadman
At
least once every 3 months
Inventory
in M2M
Check
racks for stored machined
parts; if the box date is 3 months or older, open and check
parts
for damage and deterioration; if parts are in good shape, stamp boxes
with review stamp inspection id and the date; if damage is found on any
machined parts, notify and return parts to Machining Department Leadman
immediately; if parts are sent to Machining Department, stamp boxes
with
review stamp, inspection id, and the date upon their return.
7
Machining
Department Leadman
Upon
notification from
Shipping Leadman
Rusty
or deteriorated machined
parts
Inspect
parts to assess
damages; remove rust by
whatever means necessary; inspect to verify parts are still in
tolerance with specifications; re-dip in rust-preventative; repack and
return to Shipping Dept.
8
Shipping
Leadman or Shipping
Helper
Parts
are ready to ship from
warehouse
Shipping
queue (M2M);
shipping tags; Shipping
Memo
If partial
shipment, make 2
Shipping Memos(one
for parts shipping and one for parts staying in inventory) check at
least 10% of the parts* (or a
minimum of one container, whichever is greater) for damage and
deterioration; re-clean the parts if necessary; recount and re-inspect,
looking for mixed heat codes, part numbers or mixed parts; if
indicated in Shipping
Memo, transfer parts to special or
customer-supplied containers and tag the new containers; move the
parts to the loading area.
9
Shipping
Clerk
Parts
ready to ship
Shipping
queue (M2M); Job Order; Shipping
Memos; shipping tags
Perform
"shipment setup" in M2M; print Shipper
and Certs (or get
from QA Assistant
if "special certs" job); all certs requiring QA office review as noted
by QA step in traveler must be sent to QA office. Cert will be reviewed
by QA Assistant but may involve the QA Manager
if so noted in Router);
print shipping labels; put one copy of Shipper
and Certs in envelope to go in parts container; call truck
line if needed or schedule Trinity Forge truck; verify quantities on
Shipping Memo
and sign Certs and Shipping
Memos; if quantities
match, ship product; if quantities do not match, find out what the
discrepancy is and resolve; When certs require QA authorization,
forward shipping memo and certs to QA
Manager for review. Contact freight company for shipment,
sign the Bill
of Lading.
10
QA
Assistant
Notification
that
manual certifications are required
Traveler, Shipping
Memos, and other information about the order
Create
manual Certs
and stamp with employee stamp; forward
to QA
Manager for
review and approval; scan and save
complete Cert data
packet in QA folder on the
shared drive.
11
Quality
Engineer
Information
provided
with manual Certs; Job
Order
Verify
that all
requirements placed on the job and manual Certs
have been satisfied; when satisfied
notify Shipping
Clerk that
job is approved to ship; sign
any Certs
for the order.
12
Shipping
Clerk
Upon notification paperwork
needs to be prepared
Traveler; Sales
Orders
If Traveler or Sales
Order reflects
a special review is required
by Quality
Engineer,
be sure that Quality Engineer's approval
has been secured before
continuing; verify all info (heat treat certifications, charts,
charpies,
physicals, etc.) has been properly entered; notify QA
Assistant to
correct if necessary; print Certs
and Shipper;
prepare export
papers when
required.
13
Shipping Helper
Parts
ready to ship
Shipper
and Certs
Stamp
container in which the Certs are
enclosed; all paperwork must be reviewed, checked, and stamped with
employee stamp.
14
Shipping
Clerk
After
paperwork is ready and
truck has been
scheduled
Shipping
queue (M2M); Job Order; Shipping
Memos; shipping tags; job paperwork
Print
two copies of Bill
of Lading
for
all jobs to be
shipped; print customer address labels for containers.
15
Shipping Helper
Upon
notification by Shipping Clerk
that parts
are
ready for shipment and truck is ready to load
Bill
of Lading;
shipping envelope; labels; Shipping
Memos
Attach
shipping labels to
containers and apply your
stamp to Shipping
Memos; place envelope with certifications in one of
the
shipping containers in the shipment; load truck; when all is correct,
stamp with employee stamp Trinity Forge's copy of the Bill of Lading;
have a second Shipping worker review counts and paperwork per step 11
(NOTE: this is the last point at which Trinity Forge employees control
the parts - failure to detect and report problems at this point would
be considered to be a very serious violation of procedure on part of
both team members); have driver sign Bill of Lading
and give
copy to
driver (unless Trinity Forge's truck); return
paperwork to Shipping Clerk.
16
Shipping Helper
(not same as
in step 13)
Upon
notification by other
Shipping Helper
that
truck is loaded
Bill
of Lading;
shipping
envelope; labels
Verify
that all counts and
paperwork are correct
(if not, notify your Supervisor); stamp Bill of Lading
with employee
stamp (NOTE: this is the last point at which Trinity Forge employees
control the parts - failure to detect and report problems at this point
would be considered to be a very serious violation of procedure on part
of both team members).
17
Anyone
loading truck for
delivery
Before
truck is loaded
Bill of Lading; Shipping
Memos; any other
documentation provided
If
changes are made to any
documents, the documents
MUST be initialed by a supervisor OR reprinted with the corrections
included and stamped with employee stamp.
18
Trinity
Forge's
Truck DriverIf
parts are to go on Trinity
Forge's truck; as given
loads to deliver
Bill of Lading;
shipping
envelope; labels
Ensure
that containers agree
with Bill of Lading;
deliver parts* to address on Bill
of Lading; get customer to sign Bill of Lading;
give shipping envelope and copy of Bill of Lading
to
customer; return signed Bill
of Lading to Shipping
Clerk.
19
Shipping
Clerk
After
shipping parts
Bill of Lading; Shipping
Memos
Send
one copy of Bill of
Lading along with all
Shipping Memos to
AR Clerk
20
AR Clerk
After
billing is complete
Bill of Lading; Shipping
Memos
File
Bill of Lading
and Shipping
Memos in file
cabinet.
* Machined products can be easily damaged in handling and can deteriorate in storage. Handle containers of machined parts with extreme care and only handle the parts directly under the supervision of a Machining Department team member. Report any suspected damage or deterioration to Machining Superintendent.
Revision history:
Release Date |
Description of Change |
Owner |
Approver |
10/01/2017 |
Updated to comply with revised Quality Manual and new TOPs format. |
Tim Ellis |
Todd Sheppard |
10/17/2018
|
Removed
Step 4 as it was a duplicate of step 3; Updated
steps
5,8,9, and 19 to current practices and added steps 10-12; Updated
step 11 "Who", removed QA Manager and replaced with Quality
Engineer; Updated step 12 " What to Do", replaced QA Manager with
Quality Engineer. |
David
Rogers |
Tim Ellis |
1/30/2019 |
Made changes to step 9 regarding certs. Replace QA Manager with QA Assistant. |
David Rogers |
Tim Ellis |
|
|
|
|
|
|
|
|